Refer to Rule 3. C. Bid Content and Rule Clarification 6.0 – the short answer is that you are not required to include ‘Related Work’ as defined in Part 1 of a Specification. However, you are required to include the work of other Sections where they are referenced in the other parts of the specification such as Part 2 Materials/Products and 3.0 Execution; except those items covered by the Appendix A, Standard Exclusions.